DRW Public Works Inspectors and Engineering Technicians have worked on a number of PWB projects. Our staff have worked on a new 50 Million gallon Powell Butte Reservoir, numerous pump station projects including Carolina Pump Station-Phase 2 ductile and steel water line relocation, Alder Creek diversion Dam, Bull Run road widening and the Dam #2 Towers projects. Our staff verified proper sized lines and grades quantities and verification of materials. DRW Inspectors prepare photo logs, daily reports detailing the construction methods, personnel on-site and that construction which is completed. These services require DRW personnel to verify contractor traffic and Erosion control plans are in place and working.
Project TitlePortland Water Bureau Project SupportClientPortland Water BureauServicesConstruction Inspection, Engineering Technical Support